You're viewing a public preview. Header, timeline, and map are open; full details are locked.
Sign in for 15 free views/month
Sources sought
Presolicitation
Active solicitation
Awarded
RFP not yet released. Make sure RenovationRoute alerts are turned on.
Demountable Walls at Offutt AFB
DEPT of the AIR FORCE › AIR Combat Command
The project involves the reconfiguration and installation of demountable walls at Offutt Air Force Base, specifically for the 2WS and 557WW units. The work includes disassembly, relocation, and installation of wall panels and doors in various rooms to optimize workspace.
Trade
Other building finishing
NAICS 238390
Set-aside
SBA
Est. value
Not found
Timeline
Questions due and Site visit: Not found
Sign in to unlock the full opportunity
Project specs, incumbent and pricing intel, compliance requirements, past performance criteria, submission rules, and the full strategy guide. Sign in for 15 free full views every month.
Sign in
Bid pass
Locked
Available on Professional
Win likelihood, gaps, and headroom.
Competitors
--
Gaps
--
Max
--
Updated
--
Upgrade required
Contracting Officer
Hunter Hendrix
hunter.hendrix.1@us.af.mil
(402) 294-5206
Job alerts
Email and text alerts when contracts like this one post.
NAICS 238390 · within 50 mi of 0, NE
Sign up
Solicitation FA460026Q0095 · closes Friday, September 11, 2026 at 12:00 PM BST. Items marked Our analysis are our read of the notice. Stated in solicitation means we quoted it from the notice itself. Not found means we read the notice and didn’t find it. We make mistakes, so please double check. Verify on SAM.gov.
An active SAM.gov registration is required to bid.
Official SAM.gov record
Verify on SAM.govEverything SAM publishes on this notice, on one page.
Full description
PRE-SOLICITATION OFFUTT AFB 2WS/557WW Demountable Walls 55 CONS/PKB - FA4600 106 PEACEKEEPER LN, STE 2N3, OFFUTT AFB, NE 68113 27 August 2026 Product/Service Code: N017 NAICS code: 238390 Place of Performance: Offutt AFB, Nebraska Proposed Set Aside: 100% Total Small Business Set-Aside DESCRIPTION 55CONS intends to award a sole source, firm-fixed-price contract to Encompass Corporation for the reconfiguration of Haworth Demountable Walls for the 2WS and the 557WW. This notice is not a request for competitive quotes; however, interested parties who believe they can meet the requirements listed below may submit capability statements for consideration. Please see the attached PWS's for further specifications of this requirement. Summary of Performance Work Statements: 2WS 4.1 Wall Modifications Rooms 1340 & 1342 Partition: Disassemble existing demountable wall panels dividing Rooms 1340 and 1342. Salvage, inspect, and reuse hardware to relocate and install the wall, completely enclosing Room 1342 as an independent space. Room 1332 Reconfiguration: Install new demountable partition walls to divide the current footprint into two (2) fully enclosed offices and a shared communal area, including all ceiling tracks, floor channels, acoustic seals, and trim. Room 1343 Deconstruction: Fully disassemble and remove demountable walls, door frames, and hardware from Room 1343 to restore it to an open-plan layout. Hand over salvaged components to the 557th WW Facility Manager (or legally ...
PRE-SOLICITATION OFFUTT AFB 2WS/557WW Demountable Walls 55 CONS/PKB - FA4600 106 PEACEKEEPER LN, STE 2N3, OFFUTT AFB, NE 68113 27 August 2026 Product/Service Code: N017 NAICS code: 238390 Place of Performance: Offutt AFB, Nebraska Proposed Set Aside: 100% Total Small Business Set-Aside DESCRIPTION 55CONS intends to award a sole source, firm-fixed-price contract to Encompass Corporation for the reconfiguration of Haworth Demountable Walls for the 2WS and the 557WW. This notice is not a request for competitive quotes; however, interested parties who believe they can meet the requirements listed below may submit capability statements for consideration. Please see the attached PWS's for further specifications of this requirement. Summary of Performance Work Statements: 2WS 4.1 Wall Modifications Rooms 1340 & 1342 Partition: Disassemble existing demountable wall panels dividing Rooms 1340 and 1342. Salvage, inspect, and reuse hardware to relocate and install the wall, completely enclosing Room 1342 as an independent space. Room 1332 Reconfiguration: Install new demountable partition walls to divide the current footprint into two (2) fully enclosed offices and a shared communal area, including all ceiling tracks, floor channels, acoustic seals, and trim. Room 1343 Deconstruction: Fully disassemble and remove demountable walls, door frames, and hardware from Room 1343 to restore it to an open-plan layout. Hand over salvaged components to the 557th WW Facility Manager (or legally dispose/recycle as directed). Rooms 1220, 1221, & 1222 Merger: Disassemble and remove the demountable partitions dividing Rooms 1220, 1221, and 1222 to merge them into a single, open-concept footprint. Patch and repair affected ceiling grids, floor surfaces, and adjacent walls. 4.2 Door Installations The Contractor shall install four (4) 40-inch demountable door panels configured to open inward at the following locations: Room 1342: One (1) door panel. Room 1332: Two (2) door panels (one for each of the newly constructed offices). Room 1332 (from Room 1320): One (1) door panel. 4.3 HVAC (Government Furnished Property/Work) Air Transfer Grilles: Install return air transfer grilles between Room 1340 and the new office space, and between the new offices within Room 1332 to balance static pressure and ensure proper airflow distribution. Note: This specific task (4.3) will be accomplished by the 557th Weather Wing Facilities office and is excluded from the contractor's performance requirements. B185 The contractor shall perform the following teardown, relocation, and installation tasks: Room L422 Relocation and Reconfiguration: Dismantle and move the L423 four (4) West wall panels to the East by approximately 8ft. Utilize the existing L422 door and glass panel to establish the new L422 door space. Room L423 Expansion and Reconfiguration: Reclaim and integrate existing L423 and legacy L422 demountable panels to expand the designated work area. Use on hand demountable wall stock to fill in existing wall gaps to complete the room (~25ft). Install double solid wood doors in the Southeast corner of the room, complete with appropriate framing and HAWORTH-compatible commercial hardware. Final door location determined at install (adjust as needed to accommodate install) Room L421 Configuration Use existing material stock to install new walls to close in Collaboration and training space. Approximately 25 linear feet of panels, configured as two intersecting runs of approximately 23 feet and 2 feet. Final adjustment allowed during install. Extract the legacy L423 door and associate hardware and re-install door to serve as the new entrance for Room L421. TBD during install (Adjustments allowed as needed) This requirement will be awarded using RFO part 12 Simplified Procedures. The award will be made prior to 30 September 2026. If you have any questions please reach out via email to A1C Hunter Hendrix (hunter.hendrix.1@us.af.mil) or TSgt Jennifer Prestridge (jennifer.prestridge.1@us.af.mil).
- Notice ID
- e93faca853c647bbb8fa712ee9b96fb1
- Solicitation number
- FA460026Q0095
- Product service code (PSC)
- N071
- NAICS code
- 238390
- Set-aside
- Small Business Set Aside - Total
- Posted
- Aug 27, 2026
- Inactive after
- Sep 26, 2026
Documents · 2 from SAM.gov
- WOC 2WS STATEMENT OF WORK 20 July 2026.docx Posted Aug 27, 2026 · 198 KB DOCX
- SOW B185 LL Demountable Walls.docx Posted Aug 27, 2026 · 30 KB DOCX
Files open on sam.gov. Names, sizes and dates come straight from the notice.