You're viewing a public preview. Header, timeline, and map are open; full details are locked. Sign in for 15 free views/month
Sources sought Presolicitation Active solicitation Awarded
Bids are being accepted! Review requirements and submit before the deadline

Carpet Replacement at Laughlin AFB Building 308

DEPT of the AIR FORCE › AIR Education and Training Command

This project involves the replacement of carpet and cove base on the second floor of Building 308 at Laughlin Air Force Base, Texas. The work includes installing specific types of carpet from Mohawk Group and Static Smart, with a total period of performance of 30 business days from the Notice to Proceed.Our analysis

Trade
Flooring
NAICS 238330
Set-aside
SBA
Est. value
Not stated
Timeline
Today Posted Fri Jul 10 Site visit Mon Jul 13 Deadline Mon Jul 20
Laughlin AFB, TX Open in Google Maps

Sign in to unlock the full opportunity

Project specs, incumbent and pricing intel, compliance requirements, past performance criteria, submission rules, and the full strategy guide. Sign in for 15 free full views every month.

Sign in
Bid pass Locked
Available on Professional Win likelihood, gaps, and headroom.
Competitors
--
Gaps
--
Max
--
Updated
--
Upgrade required
Contracting Officer
Dariela H. Parizo
dariela.parizo@us.af.mil
8302984352

Job alerts

Email and text alerts when contracts like this one post.

NAICS 238330 · within 50 mi of Laughlin AFB, TX
Sign up
View on SAM.gov
Solicitation FA309926Q0016 · closes Monday, July 20, 2026 at 11:00 AM BST. Items marked Our analysis are our read of the notice. Not stated means we didn’t find it. Verify on SAM.gov.
An active SAM.gov registration is required to bid.

Official SAM.gov record

Verify on SAM.gov

Everything SAM publishes on this notice, on one page.

Full description
The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code). The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the transformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility poles must not exceed the 28-foot height of the neighboring B502. Hydro trenching is restricted to a ten-foot stretch from the transformer to the rack and a three-foot diameter around each utility pole. The electrical infrastructure demands 180 feet of 2 ½ inch conduit and properly sized wiring to support six 480-volt weatherproof twist-lock receptacles, complete with dedicated disconnect switches, system grounding, and bonding. The contractor must also coordinate secondary power conduit termination with the Rio Grande Electric Cooperative (RGEC) and assume all associated subcontracting costs. Following installation, the site must be restored, graded, and cleared of rocks larger than thr...
Notice ID
6d069b38ed57449ebbc27d9eaae4abe0
Solicitation number
FA309926Q0016
Product service code (PSC)
S214
NAICS code
238330
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
Jul 10, 2026
Inactive after
Aug 04, 2026
Documents · 7 from SAM.gov

Files open on sam.gov. Generic labels are shown because the notice payload does not include original filenames.