Demolish and Regrade Connecting Corridor
The project involves the complete demolition of the exterior connecting corridor at the Walla Walla VA Medical Center, followed by the relocation of active utilities and the installation of new sidewalks, staircases, ramps, and landscaping. The work is for the Department of Veterans Affairs.
Teaming network
This contract is large enough to need a teaming partner.
Get found by primes bidding on work like this. Joining the network takes a free account, then primes searching your trade and area can reach you.
Create a free account to joinSee qualified subcontractors registered in your area for this NAICS scope. Filter by trade, set-aside, and proximity.
Find subs for this contractWe’re a growing network, so we can’t promise a match yet. We’re adding contractors and we’ll do our best to connect you.
Timeline
Sign in to unlock the full opportunity
Project specs, incumbent and pricing intel, compliance requirements, past performance criteria, submission rules, and the full strategy guide. Sign in for 15 free full views every month.
Sign inContracting Officer
Job alerts
Email and text alerts when contracts like this one post.
Official SAM.gov record
Verify on SAM.govEverything SAM publishes on this notice, on one page.
- Notice ID
- 8f558eec7eb2459397483cf90fd3e4ba
- Solicitation number
- 36C26026R0080
- Product service code (PSC)
- Z2DA
- NAICS code
- 238910
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- Aug 26, 2026
- Inactive after
- Sep 30, 2026
- Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx Posted Jul 28, 2026 · 14 KB XLSX
- Atch 16 - Site Visit Sign In Sheet.pdf Posted Aug 17, 2026 · 107 KB PDF
- Atch 19 - 00 01 10 TOC.pdf Posted Aug 20, 2026 · 149 KB PDF
- 36C26026R0080 0004.pdf Posted Aug 21, 2026 · 184 KB PDF
- Amendment 0005.pdf Posted Aug 26, 2026 · 266 KB PDF
- Atch 17 - Wage Determination 05.18.2026.pdf Posted Aug 17, 2026 · 2.6 MB PDF
- Atch 3 - Specs_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 6.8 MB PDF
- Atch 24 - Civil_GC101 Staging Area.pdf Posted Aug 20, 2026 · 724 KB PDF
- Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 160 KB PDF
- Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 425 KB PDF
- Amendment 0002.pdf Posted Aug 20, 2026 · 174 KB PDF
- Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 523 KB PDF
- Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 183 KB PDF
- 20260821 Walla Walla_EP106.pdf Posted Aug 21, 2026 · 1.1 MB PDF
- Amendment 0001.pdf Posted Aug 17, 2026 · 125 KB PDF
- Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 528 KB PDF
- Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf Posted Aug 20, 2026 · 290 KB PDF
- Atch 23 - 28 23 00 Video Surveillance rev1.pdf Posted Aug 20, 2026 · 551 KB PDF
- 20260821 Walla Walla_E-504.pdf Posted Aug 21, 2026 · 655 KB PDF
- Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 601 KB PDF
- Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf Posted Aug 20, 2026 · 1.8 MB PDF
- Atch 27 - GeoTech Report 1.pdf Posted Aug 20, 2026 · 3.6 MB PDF
- Atch 1 - SOW_Connect Corridor 687-24-101.docx Posted Jul 28, 2026 · 21 KB DOCX
- Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 747 KB PDF
- Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf Posted Aug 20, 2026 · 214 KB PDF
- Atch 2 - Drawings_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 78.4 MB PDF
- Atch 28 - GeoTech Report 2.pdf Posted Aug 20, 2026 · 6.0 MB PDF
- Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 475 KB PDF
- Amendment 0003.pdf Posted Aug 21, 2026 · 185 KB PDF
- Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf Posted Aug 20, 2026 · 3.1 MB PDF
- Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 583 KB PDF
- Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf Posted Jul 28, 2026 · 2.2 MB PDF
- Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf Posted Jul 28, 2026 · 528 KB PDF
- Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf Posted Aug 20, 2026 · 125 KB PDF
- Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx Posted Jul 28, 2026 · 115 KB DOCX
- Atch 26 - Electrical WW R2 20260818.pdf Posted Aug 20, 2026 · 8.9 MB PDF
Files open on sam.gov. Names, sizes and dates come straight from the notice.